filter_list Showing 3 results for "studios architecture paris" close Clear
search
dashboard All 7 article policy 3museum exhibitions 2article news 2
date_range Range Today This Week This Month All
Subscribe

What will the future Louvre museum look like? The architects of the century's construction site have been chosen

À quoi ressemblera le futur musée du Louvre ? Les architectes du chantier du siècle désignés

On May 18, the French Ministry of Culture announced the winner of the international competition for the 'Louvre Nouvelle Renaissance' plan, championed by President Emmanuel Macron in January 2025. The winning consortium, led by Studios Architecture Paris and Selldorf Architects with landscape firm Base, will design a major renovation of the Louvre. The project includes a new entrance on the east side near Saint-Germain-l’Auxerrois to relieve congestion at the pyramid, a belvedere overlooking vegetated moats, and a new 3,000-square-meter gallery dedicated to the Mona Lisa. Construction is not expected to begin before 2028.

A favorable court decision for contemporary stained glass at Notre-Dame

Une décision de justice favorable aux vitraux contemporains à Notre-Dame

A French court has ruled in favor of keeping contemporary stained-glass windows installed at Notre-Dame Cathedral, rejecting a legal challenge from traditionalists who sought their removal. The decision upholds the controversial replacement of 19th-century grisaille windows designed by Eugène Viollet-le-Duc with modern works by artist Pierre Soulages and others, as part of the cathedral's post-fire restoration.

The appalling mediocrity of the chosen project for the 'Grande Colonnade' of the Louvre

L'effarante médiocrité du projet retenu pour la « Grande Colonnade » du Louvre

The French Ministry of Culture has announced the winning team for the 'Grande Colonnade' project at the Louvre, selecting STUDIOS Architecture Paris and Selldorf Architects. The ministry's press release, described as self-congratulatory and written in trendy bureaucratic language, celebrates the choice as a major advancement. However, the article criticizes the lack of transparency, noting that only three exterior visuals have been released, and argues that the project is unfunded and threatens necessary renovations at the museum, as previously highlighted by the Cour des Comptes and parliamentary representatives.