filter_list Showing 3 results for "stefano boeri interiors" close Clear
search
dashboard All 3 article news 2article local 1
date_range Range Today This Week This Month All
Subscribe

Rome’s Colosseum Gets a New Pedestrian Plaza

Rome has unveiled a newly restored pedestrian plaza at the southern façade of the Colosseum following a four-year construction project. Led by Stefano Boeri Interiors, the renovation features a travertine-paved square that recreates the original floor level and footprint of the ancient amphitheater. The design uses stone plinths to mark the locations of long-lost columns, allowing visitors to visualize the massive scale of the structure as it appeared nearly 2,000 years ago.

Colosseum Facelift Restores Ancient Southern Entrance to Its Former Glory

Rome’s Colosseum has unveiled a major four-year restoration of its southern entrance, a project led by Stefano Boeri Interiors in collaboration with the Colosseum Archaeological Park. The renovation lowered the surrounding piazza to its original Roman-era height, reintroduced travertine flooring sourced from ancient quarries, and installed seating blocks that mark the locations of long-lost marble columns. During the excavation process, archaeologists recovered a wealth of historical artifacts, including ancient coins, statues, and gold jewelry, while leaving a specific section untouched to showcase the arena's complex hydraulic foundations.

Roma insiste sulla rigenerazione urbana: Stefano Boeri trasforma un ex deposito di bus in oasi verde per uffici, commerci e cultura

Stefano Boeri Architetti has been commissioned to transform a former ATAC bus depot in Rome's Prati-Delle Vittorie district into a multifunctional hub called Depositi delle Vittorie. The project, owned by the family behind the Fondazione Memmo, will convert the 16,000-square-meter disused site into a mixed-use complex featuring commercial, cultural, and leisure spaces, along with a 8,000-square-meter rooftop park suspended 15 meters high that will host art installations. Construction is set to begin in late 2027 and conclude by 2030.