filter_list Showing 3 results for "Colosseo" close Clear
search
dashboard All 7 museum exhibitions 3article local 3article policy 1
date_range Range Today This Week This Month All
Subscribe

rome new metro stations mini museums

Rome has opened two new subway stations on Line C—Colosseo/Fori Imperiali and Porta Metronia—that double as mini museums, showcasing over 500,000 artifacts unearthed during two decades of excavation. The stations, located 100 feet underground, feature displays of ancient ceramics, frescoes, mosaic floors, and the remains of a Roman military compound and thermal baths, curated by the Colosseum Archaeological Park and Sapienza University. Commuters can view the artifacts without a ticket in the station atriums, and future stations on the line will incorporate additional archaeological finds.

rome colosseum metro station archaeology

Rome's new Colosseo-Fori Imperiali metro station opened on Tuesday after 11 years of construction, featuring archaeological treasures uncovered during excavation, including ceramic fragments, statues, oil lamps, stone vessels, and 28 ancient wells. The station, part of Metro Line C, also revealed a nearly 260-foot early second-century military barracks and a home with frescoes and mosaics at the nearby Porta Metronia station. Mayor Roberto Gualtieri attended the opening ceremony, and the city plans to open a museum in the station.

Roma insiste sulla rigenerazione urbana: Stefano Boeri trasforma un ex deposito di bus in oasi verde per uffici, commerci e cultura

Stefano Boeri Architetti has been commissioned to transform a former ATAC bus depot in Rome's Prati-Delle Vittorie district into a multifunctional hub called Depositi delle Vittorie. The project, owned by the family behind the Fondazione Memmo, will convert the 16,000-square-meter disused site into a mixed-use complex featuring commercial, cultural, and leisure spaces, along with a 8,000-square-meter rooftop park suspended 15 meters high that will host art installations. Construction is set to begin in late 2027 and conclude by 2030.