filter_list Showing 4 results for "Germany" close Clear
dashboard All 17 museum exhibitions 7article news 4article policy 3article culture 1article local 1person people 1
date_range Range Today This Week This Month All
Subscribe

Julia Stoschek Foundation to Close in Berlin

The Julia Stoschek Foundation will close its Berlin outpost at the end of October 2025, after a decade of operation. The Düsseldorf-based nonprofit, which holds one of the world's largest collections of time-based art, opened the Berlin space in 2016 and welcomed over 450,000 visitors across 22 exhibitions, including solo shows by Meriem Bennani, Stan Douglas, Arthur Jafa, and Mark Leckey. The foundation cited a "strategic realignment" that will shift focus to projects elsewhere in Germany and abroad. Its Düsseldorf space is currently closed for renovations and expected to reopen next year.

Berlin Modern Museum Construction Delayed Until 2030

Museumsbau Berlin Modern verzögert sich bis 2030

The completion of Berlin Modern, a major new museum in Berlin, has been delayed again until 2030 due to moisture damage and microbial infestation found in parts of the raw structure. The Stiftung Preußischer Kulturbesitz (SPK) announced an estimated eight-month postponement, though no construction stop was required. The museum, designed by Herzog & de Meuron, is being built near Potsdamer Platz to expand the Neue Nationalgalerie's exhibition space. Costs have risen from an initial €200 million to a projected €507 million.

London Gallery Cancels Antisemitic Art Exhibit After Pro-Israel Lawyers Intervene

A London gallery, Delta House Gallery in Wandsworth, canceled a traveling exhibition titled "Drawings Against Genocide" by British artist Matthew Collings after UK Lawyers for Israel (UKLFI) intervened, citing antisemitic content. The show, scheduled for May 16-24, featured drawings with swastikas, comparisons of Israel to Nazi Germany, and depictions of Jewish figures with horns, among other imagery. Gallery owner Pineapple Corporation Chairman Tom Berglund confirmed the cancellation, stating the exhibition was arranged without owner consultation.

Opening of Berlin Modern postponed to 2030

L’ouverture du Berlin Modern repoussée à 2030

The opening of the Berlin Modern museum has been delayed to 2030 due to construction setbacks and cost overruns. According to German media outlet Monopol, the project has been plagued by humidity issues, including mold, algae, and bacteria on new surfaces, caused by winter dampness, concrete sensitivity, and faulty ventilation. Originally launched in 2019 with a planned opening in mid-2020, the museum's completion has been repeatedly pushed back, with costs soaring from an initial €200 million to over €500 million, making it the most expensive museum ever built in Germany. The building, designed by Swiss firm Herzog & de Meuron, is located at the Kulturforum and will house 20th-century art collections from the Nationalgalerie, the Marx Collection, the Pietzsch Collection, and holdings from the Kupferstichkabinett and the Kunstbibliothek.